http://20elm.ir/an-introduction-to-scheme/

ترجمه مقاله هم آهنگی حمل و نقل و انتقالات و برنامه ریزی بچینگ

ترجمه مقاله هم آهنگی حمل و نقل و انتقالات و برنامه ریزی بچینگ

بخشی از مقاله انگلیسی:
In this study, production and transportation scheduling problem in which in which each activity will be transferred for further processing plant equipment. There are several vectors m that the activities of the area is expected to transfer the plant equipment. Each machine can only transmit one activity at a time. Batching equipment can simultaneously process a set of activities addressed if the upper limit in terms of size categories exist. Each set will include processing costs associated with processing as well. In relation to the specific cases related to the fact that the transfer of activities from pre-established carriers, we have a polynomial time algorithm to create. In connection with the general problem, we prove that the process for the Py- hard (common sense) and polynomial time algorithm creates dummy. Polynomial time approximation scheme in relation to the overall problem by changing patterns dummy polynomial dynamic programming is achieved

Keywords: timing generation, transmission, dynamic programming, design full time polynomial time
توضیحات
عنوان انگلیسی مقاله: The coordination of transportation and batching scheduling
عنوان فارسی مقاله: هماهنگی نقل و انتقالات و برنامه ریزی بچینگ
دسته: مهندسی صنایع – ریاضی کاربردی
فرمت فایل ترجمه شده: WORD (قابل ویرایش)
تعداد صفحات فایل ترجمه شده: ۱۷

 

جهت مشاهده توضیحات کامل تر و دانلود اصل و ترجمه این مقاله اینجا کلیک نمایید.

ترجمه مقاله هم آهنگی حمل و نقل و انتقالات و برنامه ریزی بچینگ

هیچ نظری تا کنون برای این مطلب ارسال نشده است، اولین نفر باشید...

شمارنده